In 1889 the Anchor Mine hired two different drilling contractors to attempt a 600-foot long boring from the bottom of the flooded Anchor shaft to intersect with a drain tunnel being driven under the shaft location.
In 1889 the Anchor Mine hired two different drilling contractors to attempt a 600-foot long boring from the bottom of the flooded Anchor shaft to intersect with a drain tunnel being driven under the shaft location.